ITC required a safe access/egress into this deep excavation along with a safety winch and rescue system attached to the scaffold.
Our client required a completely dry and sealed work area so the pool could be tiled and sealed during the winter months.
This stairtower was built for BelPacific who required a safe access/egress into the excavation on their Sussex project in Burnaby.
HSS built this access scaffold for the front and rear façade of the building.